Woolworths Gordon

New ductwork with accompanying components was measured, provided, and installed for an air handling unit and two rooftop-mounted air-cooled packaged units.

What were the client’s objectives?

  • The objective was to install all ductwork in accordance with the design concept drawings, incorporating necessary alterations through on-site measurements and utilizing our in-house installation crew.

What was achieved by Tyrenian?

  • Tyrenian Group effectively managed to modify the design concept ductwork coordination and address on-site challenges and obstacles. All work was completed according to plan and delivered ahead of schedule, including after-hours operations and crane lift planning in the rear lane car park with minimal disruption to our client and other trades on the site.